Course Outline

Multi-Vendor Computed Tomography Systems Maintenance (Phase 2)

Overview

Multi-Vendor Computed Tomography Systems Maintenance is a skills development course designed as a continuation of the Principles of Servicing Computed Tomography Systems course (Phase 1). Through attending this course, the service professional will become self confident in working on the gantry, patient transport, detector assembly, DAS, SRU, X-ray control systems, andoperator workstation sub-systems. Special attention will be given to x-ray tube changes. Hands-on lab time is emphasized, and makes up approximately 80% of the overall course content.

Prerequisites

To attend this course, the service professional must have a good knowledge of CT physics and procedures gained through attendance at the RSTI Principles of Servicing Computed Tomography Systems (Phase 1) course or equivalent experience.

Objectives

Following attendance of this course, participants will be able to:

  • Change the X-ray tube, realign and recalibrate the X-ray generator
  • Calibrate, replace and align the hardware associated with the gantry and patient transport
  • Troubleshoot gantry, patient transport and X-ray systems
  • Troubleshoot the digital acquisition system and detector array
  • Troubleshoot the scan reconstruction unit
  • Troubleshoot the operator workstation

Tuition: $5995

Course Length: 2 Weeks

CEU's Awarded: 8 CEU’s

Dates:

  • Jun 1-12
  • Sep 28 - Oct 9
Register Course Schedule   Course Outline  
Need parts?

RSTI eXchange is your multi-manufacturer, multi-modality solution for diagnostic imaging replacement parts.
Request Parts

Course Outline

Day 1
  • System Operation and Power Distribution
    • Systems operational parameters
      • Major system component identification
      • System controls
        • Safety
        • Interlocks
      • Patient registration/scheduling
      • Exam/technique settings
    • System architectures
      • System block diagrams
    • Power distribution
      • Power distribution diagrams
        • Main AC power
        • Sub-system AC power
        • DC power supplies

Lab Activities

  • System Operation and Power Distribution
    • Scheduling an exam
      • Patient registration
      • Selecting technique parameters
        • Scout view
        • Axial views
        • Helical views
    • Power distribution
      • Verify AC power supplies
        • Main power distribution
        • Gantry AC power
        • Table AC power
        • Console Power
      • Verify DC power supplies
        • Control system DC power supplies
        • Gantry DC power supplies
          • Stationary
          • Rotating
        • Table DC power supplies
        • X-ray system DC power supplies
          • X-ray generator
          •  X-ray tube rotor control
          • Collimator
        • Detector/DAS area DC power supplies
Day 2

Lab Activities

  • System Operation and Power Distribution
    • Scheduling an exam
      • Patient registration
      • Selecting technique parameters
        • Scout view
        • Axial views
        • Helical views
    • Power distribution continued
      • Verify AC power supplies
        • Main power distribution
        • Gantry AC power
        • Table AC power
        • Console Power
      • Verify DC power supplies
        • Control system DC power supplies
        • Gantry DC power supplies
          • Stationary
          • Rotating
        • Table DC power supplies
        • X-ray system DC power supplies
          • X-ray generator
          • X-ray tube rotor control
          • Collimator
        • Detector/DAS area DC power supplies
Day 3
  • Motor/Motion Controls and Position Indication
    • Motor verification and replacement
      • Gantry rotation
        • Axial speed control
        • Axial motor driver
        • Harmonization/Encoding
        • Patient transport/table movement and indexing
          • Tabletop horizontal control
            • Speed control
            • Motor drivers
            • Harmonization
            • Encoding
          • Table vertical travel
            • Speed control
            • Motor drive
            • Position indication
      • Laser and light knife position indicators
          • Operation
          • Alignment

Lab Activities

  • Motor/Motion Control and Positioning
    • Gantry rotation
      • Axial driver verification
        • Axial motor driver waveforms
        • Rotational speed tests
      • Drive assembly mechanical adjustments
      • Encoder verification
    • Patient transport
      • Vertical motor driver waveforms
      • Vertical position indication
      • Horizontal motor driver waveforms
      • Encoder verification
    • Laser/Light knife adjustments
Day 4, Day 5
  • X-ray system
    • X-ray generation
      • High voltage control
      • Filament controls
        • Filament drive
        • Position (Z control)
        • Z position detection
      • Rotor controller
      • Collimator controls
        • Pre-patient
        • Post-patient
      • Filter control
    • X-ray tube change
      • Tube selection
      • De-install/install issues
      • Required calibrations and alignments

X-ray System Lab Activities

  • X-ray tube change
    • De-install procedures
    • Installation procedures
  • High voltage control waveforms
    • Intermediate voltage verification
    • kV demanded
    • kV actual
    • VCO frequency
    • IGBT/SCR gate drive
  • kV calibration
  • Filament drive waveforms
    • Filament drive demanded
    • Filament drive actual
    • mA demanded
    • mA actual
  • mA calibration
  • Z position alignment
Day 6, Day 7
  • Detector and DAS
  • Detector architectures
      • Maintenance issues
      • Detector replacement
  • DAS architectures
      • Pre-amp/channel boards
      • DAS control
      • Data convolution
  • Data transmission
      • Fiber optics
      • Slip ring data transfers
        • Optical transmission
        • Brushes
        • RF transmitters

Lab Activities

  • Pre-amp/Channel board verification
    • Detector output mapping
    • Pre-amp measurements
  • Detector/DAS replacement
    • Removal procedures
    • Installation and alignment
  • Data transfer verification
    • DAS data output
    • Data transfer through slip ring verification
    • Data to image processing verification
Day 8
  • Image processing and handling
    • Front end processing
    • Temporary preprocessed data storage
    • Image reconstruction
    • Processed image handling
      • Image generation for display
      • Image storage
        • System disk
        • MOD
        • CD/DVD ROM
        • Print services
        • DICOM

Lab Activities

  • Image reconstruction system testing
    • Image processor
    • Image generator
  • Image reconstruction testing
    • Real time reconstruction
    • Retro-reconstruction
  • Manage image files
    • Image disks
      • Replacement
      • Managing storage space
    • MOD
    • DICOM setup
    • Printer setup
Day 9
  • System control and Image Quality
    • System host computer
      • Field replaceable units
      • System hard drive
    • System to Gantry control
      • Stationary controls
      • Rotating controls
    • System to X-ray system control
      • X-ray generation
      • Collimation
    • System to image processing/handling
    • Image quality control tests

Lab Activities

  • System control and Image Quality Labs
    • System control communications verification
    • System state back-up and restore
    • QC phantom image evaluation
      • Resolution
      • Contrast
      • CT number tracking
      • Image noise
    • System troubleshooting
      • Electronic
      • Software assisted
Day 10
  • Course review
  • Final exam
  • Course evaluation
  • For information on travel expenses and hotel accommodations please see our full cover package information.
  • Course Registration

  • Personal Information

  • Contact Information


Please fill out the form below and we will contact you regarding replacement parts.

Send Me Course Updates

NEW! Live Online Training Courses

Get the same RSTI hands-on training experience with live interactive courses. Our new online training courses are live and instructor-led, allowing students to interact and engage in real-time.

Featured Courses:

View Online Training Courses

Please email training@rsti-training.com for more info and to register.