Course Outline

Servicing the GE IGS/Innova/Optima IVR Family

Overview

The Servicing the GE IGS/Innova/Optima IVR Family course is a skills development course designed to provide the experienced service professional with the skills necessary to fully service and calibrate this single/dual detector cath lab system. The Innova/IGS/Optima system is built around the JEDI generator. The Innova 2100/3100/4100, Optima 320, IGS 520/530/540, & IGS 620/630 will be covered in this course.

Note: The Innova 2121 and 3131 are dual C-Arm (BiPlane) versions of the Innova 2100 and 3100.

Prerequisites

To attend this course, the service professional must have completed RSTI’s Phases I-III or equivalent experience is required.

Objectives

  • Describe the GE Innova cath lab system components
  • Describe the function of the basic components of the GE Innova digital cath lab
  • Demonstrate an understanding of the installation procedures associated with the GE Innova Cath lab
  • Perform the necessary digital performance monitoring and quality assurance procedures
  • Perform all system calibrations and adjustments to maintain the highest quality images
  • Evaluate circuit functions to facilitate troubleshooting
  • Perform a complete and thorough preventive maintenance inspection on the unit

Tuition: $8995

Course Length: 2 Weeks

CEU's Awarded: 8 CEU’s

Dates:

  • May 12-23, 2025
  • Dec 1-12, 2025
Register Course Schedule   Course Outline  
Need parts?

RSTI eXchange is your multi-manufacturer, multi-modality solution for diagnostic imaging replacement parts.
Request Parts

Course Outline

Day 1
  • Digital cath lab overview
  • Digital imaging process overview
  • Innova Family system overview
    • Compare & Contrast systems
  • Major system components
    • LC Positioner
    • Detector sizes
      • 21/31/41cm
      • 520/530/540
      • 620/630
    • C1 Cabinet
    • C2 Cabinet
    • Table
      • Omega table
      • Elegance table
    • Smart box
    • TSSC
    • Chillers
      • Tube chiller
      • Detector chiller
    • User interface
  • Innova System evolution
  • System logins and passwords
Day 2
  • Documentation
  • System terms & acronyms
  • Required tools & test equipment
  • System specifications
  • Innova system operation
  • Lab Activities
    • Basic system operation
    • DL system software
    • Image acquisition
    • Image viewer
    • Software navigation
Day 3
  • Operations
    • DL – Digital Leader
    • Revolution Detector
    • Innova system
    • Innova digital
    • Positioner
    • Alarm systems
    • QAP – Quality Assurance Procedure
    • Advantage Workstation
  • Lab Activities:
    • DL operation
    • QAP
    • Advantage Workstation
Day 4
  • Removal of covers & panels
  • Component Identification
  • Lab Activities:
    • Covers & panels
      • DL
      • AW
      • Table
      • LC
      • JEDI generator
    • Component Identification
    • Schematic location
    • Physical location
    • Connector locations
    • Fuse location/identification
Day 5
  • Site planning and installation
  • Network configuration
    • Ethernet config
    • ArcNet Bus
    • CAN Network
    • Troubleshooting Innova internal Networks
  • Service
  • ITU/InnovaCentral Touchscreen
    replacement & configuration
  • Lab Activities
    • Mechanical alignments
    • Setups
    • Software configuration
    • Network Configuration
    • Configure and test output devices Output devices
      • PACS
      • Laser printer
      • RWS
      • Media
    • Configure and test input devices
      • Modality worklist
Day 6
  • Lab Activities:
    • Calibrations
      • DL
      • AW
      • Table
      • LC
      • JEDI generator
      • KVM
      • Monitors
      • Dosimeter
      • Detector
      • Collimator
    • Functional checks
  • System backups
  • System restore
  • Lab Activities
    • Full system calibration
    • System backups
    • System restore
Day 7
  • Lab Activities
    • Full system calibration (Cont’d)
      • DL
      • AW
      • Table
      • LC
      • JEDI generator
  • Functional Checks (Cont’d)
      • DL
      • AW
      • Table
      • LC
      • JEDI generator
Day 8
  • Preventive maintenance
    • Positioner
    • Table
    • Cabinet
    • Conditioners
      • Tube chiller
      • Detector chiller
    • Tube
    • Collimator
    • Dose
    • Power distribution
    • UPS
  • System service procedures
    • Software reload
      • DL
      • RTAC
      • JEDI
    • Options
    • Networking
  • Lab Activities
    • PM
    • Load from Cold (LFC)
Day 9
  • System schematics
    • AWS
    • Gantry
    • Generator
  • Troubleshooting
  • Error codes
  • System diagnostics
  • Lab Activities
    • Review system diagrams and communication
    • Troubleshooting
    • System diagnostics
    • Access Error logs
    • Central Listing
      • Test Points
      • LED’s
    • Networking
    • Power Distribution/Supplies
Day 10
  • Course review
  • Course evaluation
  • Final exam
  • To register for a course, fill out the information below or download our registration form.

    For information on travel expenses and hotel accommodations please see our full coverage package information.
  • Course Registration

  • Personal Information

  • Contact Information

  • This field is for validation purposes and should be left unchanged.

Please fill out the form below and we will contact you regarding replacement parts.

  • This field is for validation purposes and should be left unchanged.
Send Me Course Updates
  • This field is for validation purposes and should be left unchanged.